Revealed: Deadly rock falls, fish among 88 Transmission Gully problems
A scathing report lists 88 problems with Transmission Gully.
A scathing report lists 88 problems with Transmission Gully.
Crashes on SH1 and SH20 this afternoon have created heavy traffic and delays.
It's expected the road's opening will be delayed after two weeks at alert level 4.
Transmission Gully due to open in less than seven weeks after delays and budget blowouts.
Since April, any cab modified since 2005 must get sign-off from a specialist engineer.
Opinion: NZ needs sensible, long-term transport solutions that are sustainable.
Opinion: A curved form with long legs would be restrained enough to fit the surroundings.
Opinion: Traffic delays are bad for liveability and productivity, but also for emissions.
Opinion: It is long past time to recognise you can't build your way out of congestion.
The motorcyclist death toll reached a total of 57 people in 2020, the most since 1995.
Heading out of town for the break? Find out more about the traffic conditions here.
Work being carried out on about 2500 sites on the national roading network.
Holidaymakers heading out of Auckland can expect to be stuck in a single lane.
Within days of concerns being raised about a school pedestrian crossing, work has started.
Motorists are urged to work from home, use alternate routes or take public transport.
New pictures reveal the extent of damage to the Harbour Bridge after two crashes.
School holiday travellers warned to stay off roads and delay travel back to Auckland.
A rescue helicopter was also sent to the scene where there are still delays.
The Transport Agency has admitted that sections of Transmission Gully need to be re-laid.
The coronavirus lockdown has turned our major cities' motorways into ghost roads.
The impact of coronavirus in New Zealand was starting to make a significant impact.
Stan Semenoff says the NZTA crackdown was fuelled by a personal vendetta.
Brent Norriss was killed after being struck by a car on his way home.
New Zealand's most popular car colours revealed - who takes the chequered flag?
Auckland Council is already paying half the cost of the $4.4 billion City Rail Link.
COMMENT: Motorway project a year behind schedule and an expected $49 million over budget.
First, one truck broke down heading north, next another broke down heading south.
'I was quite surprised by how far I got thrown', says hospitalised crash victim.
The crash, by the Highbrook Dr on-ramp, was cleared about 7.45am.
Police were 'taking advantage' of a naive public to catch them out.