Work has finally begun on the $1.4 billion Waterview Connection in Auckland, with the first sod turned over.
Officials gathered at the site in Owairaka this morning where excavation will begin on a 30m-deep trench.
It is the first step for the construction of the twin 2.4km tunnels beneath suburban Auckland, which is on track to begin next year.
Excavating the trench will involve a series of explosions to fragment hard rock and the basalt retrieved will be used throughout the project for landscaping.
An 85m-long tunnel boring machine will be assembled in the trench.