Home /

What to expect from Let's Get Welly Moving

Georgina Campbell
By
Senior Multimedia Journalist·NZ Herald·
8 mins to read

There's a certain irony to the name of Wellington's most significant transport project in decades.

Let's Get Wellington Moving (LGWM) has proven to be anything but a project with pace.

The plan to solve the city's growing congestion problem was meant to be announced last August but has continually been pushed back.

Luckily, the capital is no stranger to big plans taking time or not happening at all, Transmission Gully, the failed Basin Reserve Flyover and a proposed Melling interchange

Save