The Navy's newest ship has been forced to abort its maiden voyage because of engine problems, just months after its sister ship suffered the same fault.
The HMNZS Wellington had to divert to Sydney yesterday during its voyage from Melbourne to Auckland after a water seal leaked in its port engine and its starboard engine control system developed a fault.
Second Navy ship hit by fault
AdvertisementAdvertise with NZME.