Speed limits of between 30km/h and 100km/h will be introduced around the Waterview Tunnel from around April next year.
The news comes as the NZ Transport Agency reveals there were more than 330 incidents including 20 crashes between the opening of the tunnel on July 2 and November 23.
NZTA spokeswoman Kathryn Musgrave said they had been monitoring driver behaviour and operational performance since the opening.
Being able to vary the speed limit will improve traffic flow and the performance of the state highway network. The limit will change depending on the driving conditions and traffic volumes.