By RNZ
The first significant milestone for the ill-fated International Convention Centre in Auckland is being completed today.
A year on from the SkyCity fire, an 85-tonne, 30m-long pedestrian bridge is being put in place over Hobson St.
The covered walkway will be suspended 11m above road level