NZX-listed Genesis Energy may soon start deploying underwater drones to check the 70km of tunnels that form a crucial part of its power generation network.
Genesis has tunnels around its power stations at Tongariro, Waikaremoana and Tekapo – one measuring 19km, the longest hydro tunnel in the southern hemisphere.
The tunnels need to be checked every 10 years for safety and performance.
In the past this has involved draining the tunnels before driving a team through them to take photos in dim light, with complex communication systems to ensure the inspection teams were safe, the company said.
Accurate tunnel checks for damage and debris can take a power station out of action for up to 13 days.