Water blasting and painting of the bridge will take place throughout the week, with special matting put in place to ensure debris does not fall into the surrounding waterways.
The bridge will be reduced to a single lane with stop/go traffic management in place from 6pm to 6am over the coming weeks and will be closed to over-dimension vehicles.