Feedback is sought on the future of wastewater services as part of the Rotorua Lakes Council's proposed 2019 to 2020 annual plan which is now available for public viewing.
Mayor Steve Chadwick said the plan reflected an ongoing commitment to the direction set in the 2018-28 long-term plan.
The proposed annual plan included an average 4.9 per cent rates increase, less than the 5.1 per cent increase signalled in the 2018-28 long-term plan.
"Not much has changed since last year when we adopted the long-term plan and we are continuing with what was planned for 2019 to 2020 financial year which is year two of the long-term plan," Chadwick said.
Most of the Annual Plan document was information for the public on progress to date against projects and work set out in the long-term plan.