Both lanes of Oropi Rd are now open to vehicles. The stop/go system is no longer needed.
A 50km/h speed limit will be in place across the bridge. Motorists are urged to drive cautiously over the repaired section of the road, because it is a temporary surface.
A permanent repair will be completed in a few weeks' time. Tauranga City Council would provide an update on timing once known.
A section of Oropi Rd, between Cheyne Rd and Oropi Stream Bridge, was closed on Wednesday afternoon after a sinkhole opened up. The sinkhole was caused by gradual erosion.