Robert Shaw
Tauranga
Work on roads takes too long
In 2018, the Morandi Bridge in Genoa (Italy) collapsed killing 43.
Two years later Renzo Piano's stunning 1.1km-long bridge including 19 spans 40m high on 18 pylons has opened.
In the same time the Baypark to Bayfair Link is barely out of the ground with probably two years to go.
Why do roadworks and projects take so excruciatingly long in this country?
B Ingram
Pāpāmoa
Don't destroy Cameron Rd
My goodness, look out commuters of Tauranga, we are about to have another road destroyed.
In my view, Cameron Rd between 17th Ave and the Greerton CBD was a fail, 15th Ave-Turret Rd was a fail, the top of Wahi Rd at the roundabout was a fail, Welcome Bay Rd was a fail and still too fast for such a built-up area, the Welcome Bay slip lane was a fail, and now the council is going to destroy Cameron Rd with crazy so-called improvements.
I believe it will take longer than it should, costs will blow out and the project by no means future-proofed.
Why not spend the $45m and fix up all the city's roading projects that have failed drastically?
Alan Ryan
Welcome Bay
The Bay of Plenty Times welcomes letters from readers. Please note the following:
• Letters should not exceed 200 words.
• They should be opinion based on facts or current events.
• If possible, please email.
• No noms-de-plume.
• Letters will be published with names and suburb/city.
• Please include full name, address and contact details for our records only.
• Local letter writers given preference.
• Rejected letters are not normally acknowledged.
• Letters may be edited, abridged, or rejected at the Editor's discretion.
• The Editor's decision on publication is final. No correspondence will be entered into.
Email editor@bayofplentytimes.co.nz