Refurbishments made to the Splash Centre over the Christmas and New Year period mean a partial closure, but the Whanganui East Pool is on schedule to be open in time for the warmer months.
The leisure area of the Splash Centre will be closed for refurbishment from Friday, December 22. The work includes repainting the 25-metre pool, lazy river and spa pools.
A new floor surface will also be laid. During this time the steam room, sauna and café will be closed and the entrance will be re-located.
The 'older' part of the Splash Centre, which includes the Splash Deck fitness centre and 25 metre training pool will remain open during the refurbishments. After the initial work is completed, the hydrotherapy pool will be repainted. The work will be completed by Edmonds Painting Ltd.
The only day the Splash Centre will be fully closed during the Christmas period is Christmas Day. There will be no change to the entry price.