THE council-endorsed 10-year plan (2018-28) states that between 2018-21 there will be the Fitzherbert Ave extension.
I understand that NZTA funding will cover 61 per cent of the projected costs. Warning: Nothing is set in stone but it is there currently.
This means that the long-awaited road construction to link Castlecliff and the Westbourne industrial zone to the city and SH3 route "will" be completed.
Barring a full list of benefits, this will mean that for the residents of North Castlecliff (yes, there are a North and a South Castlecliff), or those seeking access to the Rangiora St area, we can enter and exit the town along Fitzherbert, with Mill Rd /Manuka St being the possible preferred access point to and from our suburb? The unpleasant unsealed patch in Mill Rd will be sealed, I am told, after June 2019, as the excellent medical centre moved there after the WDC budget was set for 2018-2019.
While the road extension is clearly a nod to support the opening-up of industry using the Westbourne industrial zone, I see it as positive for the people of Whanganui, visitors and, of course, Castlecliff residents.