Big Sea
A second barrier has been erected at Hardinge Rd. Is this the council solution to the erosion on Hardinge Rd?
I ask because this is the second barrier that has been erected in the past five weeks and this one has components filled with water, so it is assumed this is a permanent solution.
Eighteen months ago, I rang a NCC engineer and a HBRC engineer as I was unsure who was responsible for erosion in Hardinge Rd.
I recall negative comments from both.
When a neighbour submitted a photo a couple of months ago, an engineer said he was unaware there was a problem. That is not true.